zappi
26
operation and installation manual
Installation
Installation
Mounting
1.
Remove the white front plate by unscrewing the M3 screw at the bottom and sliding it upwards before lifting it away.
2.
Unscrew the 12 M4 screws now exposed and lift off the enclosure cover.
3.
Offer the unit up to the wall and mark the holes for drilling. If fixing to a timber stud wall, you can use the two central
vertically aligned fixing points
to screw the enclosure directly into the timber. The two additional mounting points
can be also be used if desired.
The supply cable entry can be via the rear grommet
or by drilling the enclosure at the bottom right
and using a
suitable cable gland.
x12