Page
45
Geophysical Search System
2
1
The soil
6 M
3 M
3 M
Important note
:
If the error signal persists for the non-wiring mode, this means that
there is something wrong with the wires and it must be checked and the connections
between the connecting tweezers, the wires and the probe are well also and if verified
and this note continues, This means that the conductivity of the soil is very weak and
the sensor site needs to be moistened with water more, and sometimes you may have to
drill 10 to 15 cm at the site of the sensor site to obtain conductivity with the soil.
2- Ensure that the distance between the electrodes is equal:
This means that if the distance is, for example,
6
meters, the distance between
the first pole and the second pole must be equal to
3 m
/
3 m
START WORKING
Summary of Contents for MF-1100 Pro
Page 52: ...Page 51 NOTES...