background image

 

00-02-0839 
2012-09-21 

Section 78

 

 

 

 

 

 

PowerView™ 

Model PV25 

 

 

Installation/Operations Manual 

 

1-800-548-1191 - http://www.partdeal.com - [email protected]

Summary of Contents for PowerView PV25

Page 1: ...00 02 0839 2012 09 21 Section 78 PowerView ModelPV25 Installation OperationsManual 1 800 548 1191 http www partdeal com info partdeal com...

Page 2: ...time The latest version of this manual can be found at www fwmurphy com Please read the following information before installing BEFORE BEGINNING INSTALLATION OF THIS MURPHY PRODUCT Read and follow al...

Page 3: ...dication 9 Indicators for Active Fault Codes 9 Warning or Shutdown Screens 9 DM13 Start Stop Broadcast 9 Tier 4 and EU Emissions Standard Stage IIIB 10 Mounting and Installation 11 Product Dimensions...

Page 4: ...THIS PAGE INTENTIONALLY LEFT BLANK 1 800 548 1191 http www partdeal com info partdeal com...

Page 5: ...f displays Basic Functions Access all menus and functions of the PV25 by using the UP and DOWN arrows on the front of the gauge When power is first applied to the PV25 Parameter readings begin to disp...

Page 6: ...st scroll to Show 1 up and momentarily press both arrows release and parameter readings begin to display Menu Item Options Action Show 1 up Switch to the parameter display Momentarily hold the Up Down...

Page 7: ...the Up Down arrows simultaneously and release Set Units The Set Units Config menu will allow the user to select between the following unit settings English Metric kPa Metric BAR Exit An asterisk to th...

Page 8: ...econds on each parameter reading If Scroll is OFF view parameters manually by pressing the Up or Down arrow To toggle ON or OFF press the Up Down arrows at the same time Machine Hours ON OFF When set...

Page 9: ...urn to the Main menu Momentarily press the Up Down arrows to reach the Tier 4 menu Select and set a Tier 4 choice by pressing the Up Down arrows An asterisk shows next to the selection Backlight The B...

Page 10: ...65257 Total Fuel Used 65266 Average Fuel Economy Avg Econ 65257 Trip Fuel 65262 Engine Oil Temperature Oil Temp 65270 Exhaust Gas Temperature Exh Tmp 65270 Air Filter Differential Pressure AirDifPr 64...

Page 11: ...when a fault occurs The screen lists the SPN FMI and Occurrence Count If there is more than one fault PV25 automatically scrolls through all faults DM13 Start Stop Broadcast This message is used to s...

Page 12: ...1110836 under PV25 Literature on the Murphy Web site www fwmurphy com Tier 4 must be set to ON in the Main menu If Tier 4 is ON and there is Tier 4 activity the Tier 4 symbols show at the left of the...

Page 13: ...00 02 0839 11 2012 09 21 Mounting and Installation Product Dimensions Connection Detail Typical Wiring Diagram 1 800 548 1191 http www partdeal com info partdeal com...

Page 14: ...device Use SAE J1939 CAN compliant wiring Only use 120 OHM characteristic impedance cable ex Belden 9841 CAN Shield connected to ECU end only Do not connect to PV25 Port B other than to terminate CAN...

Page 15: ...40 F to 158 F Storage Temperature 55 C to 85 C 67 F to 185 F Sealing IP68 CAN Bus SAE J1939 compliant Connectors 4 pin AMP Mini universal Mate N Lok connector AMP Plug P N 172338 1 AMP Socket P N 171...

Page 16: ...1 800 548 1191 http www partdeal com info partdeal com...

Reviews: