DIMENSIONAL DRAWING
Prior to roughing consult with local, state, and federal codes for proper mounting height.
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
CONTEMPORARY WATER COOLERS
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
DRINKING FOUNTAINS
A152-BF4-FRA
Page 3 of 18
NEW
7020-945-001
MURDOCK MFG. •
15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
Member of
30
1
2
"
31
1
4
"
16"
1
25
3
8
"
NOTES:
1.
STANDARD BI-LEVEL INSTALLATION SHOWN,
RBL REVERSE BI-LEVEL MOUNTING FRAME
IS OPPOSITE.
PROVIDE 30-1/2" x 31-1/4" TALL WALL OPENING AT
HEIGHT INDICATED. PROVIDE STRUCTURAL
SUPPORT AROUND THE OPENING FOR FRAME
ANCHORING. NOTE: PROVIDE A ROUGH-IN OPENING
THAT IS PLUMB AND LEVEL. THE ROUGH-IN OPENING
INDICATED ABOVE IS
1
2
" WIDER THAN THE OUTSIDE
FRAME DIMENSIONS AND
1
4
" TALLER.
CAREFULLY REMOVE BI-LEVEL MOUNTING FRAME 1
AND PANEL FROM PACKAGING PREVENTING
DAMAGE.
FINISHED
FLOOR
INSTALLATION INSTRUCTIONS:
A-
B-
C- CENTER FRAME 1 WITHIN WALL OPENING AND
WHILE MAINTAINING THE INTEGRITY OF THE FRAME,
PLUMB AND LEVEL SECURING THE BOTTOM OF
THE FRAME. SHIM AND SECURE THROUGH THE SIDES,
TOP AND BOTTOM USING HARDWARE BY 2 OTHERS.
NOTE: FLANGES 3 ARE INTENDED TO OVERLAP
FINISHED WALL.