A132-BF4
Page 11 of 21
Revised:
09/29/16
7020-946-001
MURDOCK MFG. •
15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
Member of
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
CONTEMPORARY WATER COOLERS
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
DRINKING FOUNTAINS
ELECTRICAL INSTALLATION:
NOTE:
Plug in power is a standard feature.
1A. Plug-In Operation: Plug transformer provided into GFCI protected electrical service, used by the semi-
recessed bottle filler. Plug in transformer to power supply and connect to red sensor wire.
Red Wire
Blue Wire
Sensor
Plug-In Transformer
Junction Box
Provided
9-12VDC Solenoid
Valve