7.7
Inlets, Tunnel Doors, Outlets
•
Defining the Inlets/Tunnel Doors
•
7.7.1
D
EFINING THE
I
NLETS
/T
UNNEL
D
OORS
Define up to four relays or analog output ports as inlets or tunnel doors (each device
requires two relays or one analogue port) (refer to Mapping Devices, page 48).
•
Define:
o
Normal State
o
Position: Define how the inlet opening is controlled:
By time
Potentiometer
o
Auto Calib.: Enable automatic calibration. Refer to Inlet and Curtain Ventilation, page
117.
o
Power up calibration: Enable this parameter to calibrate inlets each time that Trio is
turned on.
o
Open/Close Time: Enter the amount of time required to fully open or fully close the inlet.
These parameters are only enabled when Position/By Time is selected.
Summary of Contents for Rotem Trio 20
Page 20: ... Munters AB 2020 20 Figure 6 Relay and port numbering ...
Page 44: ... Munters AB 2020 44 ...
Page 99: ... Munters AB 2020 99 Refer to Tunnel Ventilation page 123 for more details ...
Page 141: ... Munters AB 2020 141 If an outside temperature sensor is enabled map timers to it if required ...
Page 160: ... Munters AB 2020 160 23 3 2TRIO 20 CONTAINER SPARE PARTS ...
Page 162: ... Munters AB 2020 162 23 3 3TRIO 20 DOOR CARDS SPARE PARTS ...
Page 164: ... Munters AB 2020 164 23 3 4TRIO 20 MAIN CONTAINER SPARE PARTS ...
Page 186: ... Munters AB 2020 186 Figure 33 Relay and port numbering 26 2 3POWER Figure 34 Power ports ...
Page 199: ... Munters AB 2020 199 2 Insert and secure the SMA connector ...
Page 202: ... Munters AB 2020 202 example only ...