
7
© Munters Corporation, February 2019
QM1061r1
Operation
4.
INITIAL START-UP:
With electrical power off, verify that the fan propeller turns freely
and that all fasteners are secure. Turn on electrical power and confirm that the fan
operates smoothly.
ADJUSTMENTS:
Set the fan control to the temperature shown on your ventilations
system drawing, or to a value which will provide the desired environmental
conditions.
WARNING
!
Disconnect Power
Before Servicing
WARNING
!
Moving Parts, Disconnect
Power Before Servicing.
WARNING
!
Moving Parts: Disconnect
Power Before Servicing.
4.1 Operation
WARNING
!
Do Not Power Wash
Electrical Devices.