background image

11

© Munters Corporation, December 2019

QM1059r6

Operation

4.

INITIAL START-UP: 

 With electrical power off, verify that the fan propeller turns freely 

and that all fasteners are secure. Turn on electrical power and confirm that the fan 
operates smoothly.

ADJUSTMENTS:

  Set the fan control to the temperature shown on your ventilations 

system drawing, or to a value which will provide the desired environmental 
conditions.

Single Phase Fans:

  When variable speed controls are used, the fan's idle speed will 

need to be set to the recommended minimum airflow rate. Refer to the procedures 
included with each control. The table below provides airflow rates at various propeller 
speeds for fans wired for 240 VAC.

A = Fan with cone & shutter     B = Fan with hood & shutter

   CFM

0.02” Static Pressure

0.05” Static Pressure

A

B

A

B

RPM

VOLTS RPM

VOLTS RPM

VOLTS RPM

VOLTS

36” Fans

750

350

121

1000

370

123

390

128

1250

330

117

330

119

390

127

410

130

1500

360

123

360

125

410

131

430

134

1750

370

125

370

127

425

136

440

136

2000

380

128

390

130

450

137

460

139

2500

410

131

420

135

470

141

480

143

3000

430

135

440

138

490

145

500

146

4000

470

142

480

145

520

149

530

151

5000

520

148

530

152

560

156

570

158

6000

560

154

580

159

590

161

600

162

7000

610

159

640

165

640

166

680

172

8000

650

166

700

173

690

172

750

179

9000

710

172

760

185

740

178

810

209

10,000

770

179

840

225

790

195

11,300

840

223

Three Phase Fans:
1)

  The use of a quality frequency drive and the installation of line reactors is recommended 

to reduce voltage spikes and harmonic distortion.

2)

  Minimum operating frequency of 30 Hz.

3)

  Will require three pole contactors with overload protection (by others).

4)

  36" Direct Drive, 3 Phase fan is not suitable for frequency drive.

4.1 Operation

WARNING

!

Disconnect Power 

Before Servicing

WARNING

!

Moving Parts, Disconnect 

Power Before Servicing.

WARNING

!

Moving Parts: Disconnect 

Power Before Servicing.

WARNING

!

Do Not Power Wash 

Electrical Devices.

Summary of Contents for AX Series

Page 1: ...1 Munters Corporation December 2019 QM1059r6 Instruction Manual AX and GB Series 36 Tilt Fan with Galvanized Cone Models AX36Tx AX36xTx GB36Tx GB36xTx AX and GB Series 36 Tilt Fans with Galvanized Cone ...

Page 2: ...For Warranty claims information see the Warranty Claims and Return Policy form QM1021 available from the Munters Corporation office at 1 800 227 2376 or by e mail at aghort info munters com Conditions and Limitations Products and Systems involved in a warranty claim under the Warranty Claims and Return Policy shall have been properly installed maintained and operated under competent supervision ac...

Page 3: ...cking the Equipment 4 1 1 Parts List 4 1 2 Dimensions 5 2 Installation Instructions 6 3 Electrical Wiring 9 3 1 Electrical Wiring 9 3 2 Recommended Wire Routing 10 4 Operation 11 5 Maintenance 12 13 6 Winterizing 14 7 Troubleshooting 15 8 Exploded View and Parts List 16 17 ...

Page 4: ...nt Remove packing Materials and examine all components for signs of shipping damage Any shipping damage is the customers responsibility and should be reported immediately to your freight carrier 1 1 Parts List HP1098 Hardware Package for 36 Tilt Fan ID Qty Cat No Description A 12 KS2463 x 1 5 Hex Lag Screw ZP B 16 KS1153 20 x SRTD HX Flange Head Bolt ZP C 12 KS1151 20 x SRTD HX Flange Head Bolt ZP...

Page 5: ...C or 208 240 480 VAC Phase 1 or 3 Cat No Fan Dia A B C D Dia E F G Wall Openings I D Framed AX GB36T 36 45 W x 453 4 H 6 123 16 43 44 46 19 43 W x 45 H AX GB365T 36 45 W x 453 4 H 6 123 16 43 44 46 19 43 W x 45 H Dimensions D D ia F Wall Opening E Unpacking the Equipment Chapter 1 A A B C C Wall Opening Wall Opening G 9 Guard ...

Page 6: ...art Ceiling Recommended Clearance Fan with outlet guard maintain 8 minimum clearance on all sides Fan with discharge cone maintain 12 minimum clearance on all sides Step 1 Construct a framed opening to correct size according to Wall Opening listed in chart on previous page and your fan size See Figure 1 Step 2 Insert fan into framed opening from the inside See Figure 2 Figure 2 ...

Page 7: ...42 Figure 3B Figure 3A NOTE This is NOT the Wall Opening Size Step 4 Proceed to the installation instructions for the Discharge Cone Form QM1023 Once Discharge Cone is completed proceed to Electrical Wiring Section before the Shutter Installation Step 5 Add flashing and or caulk around completed housing on exterior side of building wall Step 6 Make electrical connections to fan motor per instructi...

Page 8: ...7 Insert shutter into fan by sliding the bottom flange of shutter into bottom shutter clips and pressing shutter inward See Figure 4A Fasten shutter in place by rotating the side and top shutter clips over the shutter flanges See Figure 4B Bottom Shutter Clips Shutter Figure 4A Figure 4B ...

Page 9: ...air movement is essential should be connected to individual electrical circuits with a minimum of two circuits per room For electrical connection requirements refer to diagram on motor nameplate and to information enclosed with the environmental control to be used Single Phase Fans motor overload protection should be provided for each fan A Circuit Breaker Switch or slow blow motor type fuses must...

Page 10: ...he back of the motor form a Drip Loop and then run power cable down along strut and zip tie the cable to strut to prevent cable from getting tangled in pulley or belt See Figure 6 Then run cable out the drain hole to the circuit breaker or control panel 3 2 Recommended Wire Routing Zip Tie Drip Loop Figure 6 ...

Page 11: ...000 370 123 390 128 1250 330 117 330 119 390 127 410 130 1500 360 123 360 125 410 131 430 134 1750 370 125 370 127 425 136 440 136 2000 380 128 390 130 450 137 460 139 2500 410 131 420 135 470 141 480 143 3000 430 135 440 138 490 145 500 146 4000 470 142 480 145 520 149 530 151 5000 520 148 530 152 560 156 570 158 6000 560 154 580 159 590 161 600 162 7000 610 159 640 165 640 166 680 172 8000 650 1...

Page 12: ...h should be used GUARD Clean any dust or feathers from fan guards using a brush Dirty guards can reduce airflow 3 CHECK FASTENERS For safety all fasteners should be inspected 1 month after initial operation and yearly thereafter Tighten any loose connections 4 INSPECT FAN CONTROL With power disconnected inspect all electrical connections Wiring should be secure and in good condition Remove any dus...

Page 13: ...first 3 days of fan operation and every 4 6 months thereafter Solid Belt To adjust the belt tensioner to the proper setting loosen 10 mm bolt fastening tensioner to bracket using 17mm end wrench to allow tensioner arm to rotate Working from inlet motor side of fan place a 27 mm 11 16 wrench onto the hex on the tensioner Turn wrench counterclockwise until the single mark on base of the belt tension...

Page 14: ...ther to avoid unnecessary heat loss and condensation To winterize turn fan control off Install the insulated closure panel over the fan intake If you don t have an insulated closure panel a piece of rigid insulation material can be used Remember the insulation panel must be removed before warmer weather returns NOTE At least one single speed fan should be left uncovered and with power available to...

Page 15: ...breaker 3 Realign motor in fan housing 4 Repair or replace control 5 Repair or replace motor 1 See operation Step 2 for adjustments guidelines 2 Clean guard 3 See operation Step 2 for adjustments guidelines 4 See Maintenance Section Belt Tensioning 1 Adjust bearing position to realign propeller 2 Repair or replace motor or shaft bearings 3 See operation Step 2 for adjustments guidelines 4 Repair o...

Page 16: ... Munters Corporation December 2019 16 QM1059r6 Exploded View 8 ...

Page 17: ...ket Motor Support CTD GZ 1 13 FH2402K FH2406 FH2439 FH2402K FH2406 FH2439 Belt Tensioner Assembly with 3 idler pulley 3 idler pulley only with bolt Tensioner Arm only AL 1 1 1 14 FH2505 FH2505 Mounting Bracket for Belt Tensioner CTD GZ 1 15 FH2057 FH2057 Bearing 1 Bore x 1 44 CL CI Holder 2 16 FH2815 FH2815 Bracket Bearing Mount GZ 1 17 FH2086 FH2101 Shaft STEEL 1 18 FH2091 FH2033 Propeller Sheave...

Page 18: ...8 739 235 Italy Munters Italy S p A Chiusavecchia Phone 39 0183 52 11 Japan Munters K K Phone 81 3 5970 0021 Korea Munters Korea Co Ltd Phone 82 2 761 8701 Mexico Munters Mexico Phone 52 818 262 54 00 Russia Munters AB Phone 7 812 448 5740 Singapore Munters Pte Ltd Phone 65 744 6828 South Africa and Sub Sahara Countries Munters Pty Ltd Phone 27 11 997 2000 Spain Munters Spain S A Phone 34 91 640 0...

Reviews: