Confirm that there is enough room for installation and mainte-
nance.
5. INSTALLATION SPACE
Fig.5-2
Fig.5-1
Maint enance roomage
Maint enance roomage
checking orifice
or
m
o
re
600mmX600mm
50
0m
m
or
m
o
re
600
mm
checking orifice
Confirm the minimum
drain tilt is 1/100 or more
Cover the pipe before connecting to keep rubbish, dust or other
impurities out.
6. REFRIGERANT PIPE
Gas side
Piping
Capaticyl(KW)
Piping material
Copper special for air conditioner
7.1/8/9/11.2/14/16/20/25/28
15.9
9.52
Liquid side
Table.6-1
The indoor unit show as
Fig.4-20
Following
Fig.4-21
twist-off the screws, along the direction of A
get off the cover plate A and cover plate B.
Dismounting bolt A
Dismounting bolt C
Along the direction of B and C divided the part B and part C of
indoor unit.
The part A and part B of indoor unit individual put into the
positionsite, then install the indoor unit following
the reverse
order of step 2,3,4 and 5.
Maintenance of motor
1
2
3
4
5
As figure dismounting the bolt of bottom,get down the bottom
cover plate.
As figure dismounting 6 bolts in the front plate.
Support the fan subassembly from the bottom, then litter up, get
down fan subassembly.
After finished maintenance of motor, then install the motor
assembly in the reverse order of step 1,2 and 3.
During this process,the indoor unit don’t need dismounted.
1
2
3
4
5
6
Fig.4-12
bolt
motor
assembly
bottom
cover plate
screw
pothook
scroll
NOTE
During teardown and installation, the scroll was allowed direct
support by hand
Fan subassembly is more weightiness, please take careful
during teardown and installation, and keep from hurt by fan
subassembly.
maintenance of motor
˖
0 1 2
F
3
E
4
D
5
C
6
B
7
A
89
Installation manual
10
High pressure duct