5. Install the adapter on the transmission using
the thicker gasket (0.020") included with the
installation kit.
Torque cap screws (M12x30)
to 50 ft.lbs.
Measure backlash between the adapter and
transmission gear. Backlash should measure
between 0.006"-0.012".
Adjust as necessary using the second gasket.
Additional gaskets are available from Muncie
Power, if necessary.
6. Install PTO (See IN84-03 for installation
instructions).
Use edge molded gasket between the adapter
and the PTO, or between the adapter and any
spacer plates required for PTO installation. (Not
required to measure backlash if no spacers are
used between the PTO and the adapter.)
It is critical that the edge molded gasket be
used against the adapter! Failure to do so may
result in leaking!
201 East Jackson Street • Muncie, Indiana 47305
800-367-7867 • Fax 765-284-6991 • [email protected] • www.munciepower.com
Specifications are subject to change without notice. Visit www.munciepower.com
for warranties and literature. All rights reserved. © Muncie Power Products, Inc. (2021)
A Member of the Interpump Group
IN20-07 (Rev. 02-21)
Gasket
0.010" - 13M35151
0.020" - 13M35152
(Helical gear should
be on right side)
Torque to 50 ft.lbs. (8 places)
Edge molded gasket P/N 13T65089
Used between adapter and spacer
Spacer (2 used on 828S-U6815,
1 used on 828S-U6819)
TG Series, 82 Series 05 - 13 ratios
Setting backlash between PTO and adapter NOT required
Edge molded gasket - P/N 13T65089
Measuring backlash not required
82 Series 15 and 19 ratios only
Backlash must be set between PTO and adapter!
Paper gasket