
FOLD OUT THE BACK, PROCEED TO NAIL IT
INTO POSITION MAKING SURE YOU ARE
SQUARE AT ALL TIMES.
NEXT STEP.
TAP INTO POSITION YOUR FLANGES
INTO THE HOLES PROVIDED IF YOU
WISH YOU CAN SCREW IN 1 SCREW
INTO THE MIDDLE OF THE FLANGE
AND SLIDE ON YOUR HANGING RAIL.
NEXT STEP: GO TO YOUR PART 2
FOR INSTUCTIONS ON HOW TO
BUILD YOUR DRAWER.
FIXED SHELF
KICK
TAKE YOUR GABLES AND LAY THEM OUT
FLAT, YOU SHOULD HAVE A LEFT AND
RIGHT GABLE.
NEXT STEP REQUIRES YOU TO OPEN PART 2
AND RETREVE THE INFILL. AND SCREWS.
ALIGN YOUR SHELVES AND KICK TO THE LEFT
-
HAND GABLE, SCREW THEM INTO PLACE ATTACH
YOUR RIGHT
-
HAND GABLE AND DO THE SAME.
INFILL
ALIGN YOUR SHELVES AND KICK TO THE LEFT
-
HAND GABLE, SCREW THEM INTO PLACE ATTACH
YOUR RIGHT
-
HAND GABLE AND DO THE SAME.
INSERT YOUR 4 PINS INTO THE
HOLE NO: THEN INSERT THE
CAMS INTO THE HOLES
PROVIDED ON YOUR SHELF .
USING SCREW DRIVER TWIST
CAM INTO LOCK POSITION.