
12/11/2019 Version 2.2
Load the landing gear down tubes into the the aluminum connector that
you installed to the bottom center plate in the previous steps. Use the
smallest screws in the pre-drilled, threaded holes to secure each landing
gear leg. Leave this screw somewhat loose so that you can move the
landing leg so that the pre-drilled hole will match up with the aluminum “T”
connector to attach the landing skids in the next step.
15