![Multiplex BIC Quick Start Manual Download Page 2](http://html1.mh-extra.com/html/multiplex/bic/bic_quick-start-manual_1854676002.webp)
8. Remove bolts from cup holder mounting
brackets and remove cup holders.
9. Remove caps and hanger brackets from front
and top of blender chambers
10. Remove plastic cover from both blend chambers.
11. Remove bolts from blend chamber frame. Lift
up and slide blend chamber forward to access
drain clamp.
12. Remove clamp and drain hose from both blend
chambers. Remove drain hose from unit. Save
squeeze clamps from blend chambers. Discard old
drain hose. And gas/water inlet fitting bracket.
13. Route new drain lines from rear of unit to blend
chambers and center drain. Drain lines should
be installed underneath the wire harness to
avoid high spots in drain. Align notches on drain
lines with splines on blender drains and install
with squeeze clamps. Tighten clamp on center
drain hose and install drain line to ice bowl with
oetiker clamp provided in install kit.
14. Slide blend chambers back into position and
install bolts to frame.
15. Reinstall plastic blender covers.
16. Reinstall hanger brackets and caps to top of
blend chambers.
17. Reinstall cup dispenser.
Multiplex
2100 Future Drive
Sellersburg, IN 47172
Phone: 844-724-2273
Fax: 920-683-7592
08/28/2018
9295083
Page 2 of 4
BIC Manual Fill Drain Installation
Applicable to MA-8-2, MA-8-2BF, MA-8-2AF