Multiplex BIC Quick Start Manual Download Page 2

8.  Remove bolts from cup holder mounting 

brackets and remove cup holders.

9.  Remove caps and hanger brackets from front 

and top of blender chambers

10. Remove plastic cover from both blend chambers.

11. Remove bolts from blend chamber frame. Lift 

up and slide blend chamber forward to access 

drain clamp.

12. Remove clamp and drain hose from both blend 

chambers. Remove drain hose from unit. Save 

squeeze clamps from blend chambers. Discard old 

drain hose. And gas/water inlet fitting bracket.

13. Route new drain lines from rear of unit to blend 

chambers and center drain. Drain lines should 

be installed underneath the wire harness to 

avoid high spots in drain. Align notches on drain 

lines with splines on blender drains and install 

with squeeze clamps. Tighten clamp on center 

drain hose and install drain line to ice bowl with 

oetiker clamp provided in install kit.

14. Slide blend chambers back into position and 

install bolts to frame.

15. Reinstall plastic blender covers.
16. Reinstall hanger brackets and caps to top of 

blend chambers.

17. Reinstall cup dispenser.

Multiplex 
2100 Future Drive 
Sellersburg, IN 47172

Phone: 844-724-2273
Fax:  920-683-7592

08/28/2018 
9295083 
Page 2 of 4

BIC Manual Fill Drain Installation

Applicable to MA-8-2, MA-8-2BF, MA-8-2AF

Reviews: