background image

 

 

Warranty 

 

The warranty covers installation for a period of three months. This warranty does not cover fabric replacement without an installation by our 
technicians. 

This warranty encloses the structure against any fabrication defect for a period of one year. Any change or modification of the structure or 
addition of a product, which is not recommended by Multiple Awnings,

 

will automatically cancel the warranty.  

This warranty does not cover Acts of God (Great wind, storms, major accumulations of rain, or ice, or snow)  

The owner HAS TO REMOVE ICE/SNOW/OR ANY OTHER MATERIAL from the structure. 

This warranty will be void if:  

1. There is use of concrete blocks as anchors (it may harm the product); 
2. There is use of a cable tie-wrap on the eyelets to retain the cloth. 

 
 
 
Join us 

Multiple Awnings / Customer Service 

1701, boul de l'Industrie 
Beloeil (Quebec) 
J3G 4S5 
 

Tel:

 (450) 446-4182 / 1 (866) 446-4182 

Fax:

 (450) 446-9364 

 

Email: [email protected] 

 
 
 
 
 

The whole team of Multiple Awnings thanks you to trust them. 

 
 
 
 
 
 
 
 

 

 

Summary of Contents for Winter Shelter

Page 1: ... Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored This is a temporary structure and not recommended as a permanent structure It is recommended to be at least 2 people to assembly this shelter Estimated installation time 2 hours 1 866 446 4182 ...

Page 2: ...tree sap birds etc They are not designed to hold roof loads that accompany snow ice or heavy rains If your canopy is not anchored securely it can be lifted but the wind and will fly away If your canopy takes flight we are not responsible for any replacement If you know strong weather is predicted remove the cover or take down the canopy unit completely The cover is designed to by quickly and easil...

Page 3: ...9 A10005 Door rail male 50 2 2 2 2 2 2 A10006 Door rail female 43 2 2 2 2 2 2 A10007 Crossbar 60 2 2 2 2 2 4 A10008 Female eextension 48 5 5 5 5 5 5 A10009 Male extension 50 10 15 20 25 30 35 B10001 Bolts 1 16 18 20 22 24 28 B10002 Bolts 2 22 27 32 37 42 47 B10003 S Hooks 12 12 12 12 12 12 B10004 Rail Hooks 12 12 12 12 12 12 B10005 Elastics 12 12 12 12 12 12 B10006 Floor brackets 4 4 4 4 4 6 B1000...

Page 4: ...4 Installation 1 ARCHES FRAME LAY OUT a Place all structure components on the ground as per the drawing below Front and rear arches Middle arches ...

Page 5: ...N THE GROUND a Start by assembling the arches to the horizontal frame While assembling the arches parts it is not necessary to tighten all screws and nuts Later you will be required to add a few parts to the arches assembly ...

Page 6: ...base to the first two arches c Join the arches with a diagonal bar as per the drawing d Install the two top supports between the arches e Repeat the same pattern for all the other arches At the end of the installation process there should be four diagonal bars installed two on each end Once all the arches are linked together as per the drawing you can start to tighten the screws and nuts ...

Page 7: ... avoid any flapping due to the wind If the shelter is installed in a wide open area additional anchorages may be required 5 INSTALLATION OF THE CANVAS a Please unwind the canvas on the ground It is not necessarily rolled up lengthwise b Set up the canvas on the structure c Attach the canvas to the structure For your safety avoid making the installation when it is windy ...

Page 8: ...ancel the warranty This warranty does not cover Acts of God Great wind storms major accumulations of rain or ice or snow The owner HAS TO REMOVE ICE SNOW OR ANY OTHER MATERIAL from the structure This warranty will be void if 1 There is use of concrete blocks as anchors it may harm the product 2 There is use of a cable tie wrap on the eyelets to retain the cloth Join us Multiple Awnings Customer Se...

Reviews: