background image

Page 5

Page 6

STEP 4

Ø 

10

 mm / 0,254  nch

DD - 01 x 11

STEP 5

 STEP 6

TFC - 01 X 3

A-

TFC - 01 X 2

DD - 01 X 2

SC - 101

B-

VIDEO

https://youtu.be/ZLoblB_9C9g

SC - 98

TFC - 01 X 6

A-

A-

B-

SC - 101 X 3

https://youtu.be/t5xEcWUooe4

VIDEO

FİRST LOCATE THE STUDS BY USİNG ''STUD 

FİNDER'' İN THE WALL AND DRİLL İT 

ACCORDİNG TO THE HEİGHT MEASURMENTS 

GİVEN ON THE SİDE.

UPPER HOLES SHOULD BE DRİLLED 

FOR ATTACHİNG 

BED

 AT NEXT STEP.

SUPPLY DRYWALL FASTENERS APPROPPRİATE  

TO YOUR WALL TYPE. WE RECOMMEND 

USİNG STEEL TOGGLE BOLT ANCHOR THAT 

SHOWN BELOW

NOT INCLUDED

WARNING:

Do not mount furniture on to 

paper-mache or sheetrock like 

material properly it to stud.

WALLS MADE OF DRYWALL WITH WOODEN OR METAL STUDS

 

Summary of Contents for A 751 SIMPLE TWIN 100 CM

Page 1: ...Assembly Instructions 60 min 110min Technical Service End User A 751 SIMPLE TWIN 100 CM VIDEO https youtu be v0iYmDpHkwQ...

Page 2: ...ece DD 01 R10 18 piece TFC 01 8x70 mm 18 piece SG 01 4 piece TAP 01 32 piece KVL 01 14 piece MNG 01 32 piece Accessories List MNX 02 12 piece MNX 03 10 piece PL 04 5x12x0 7 mm 4 piece SC 79 2 piece BK...

Page 3: ...Page 2 A B D C A E R E L F F K G R G L SC 101 3 piece AL 01 4MM 1 piece AL 02 5MM 1 piece KOR B 1 piece LTA 01 14 piece H...

Page 4: ...Page 3 STEP 1 E R E L F F BKA 01 F KBY 02 E SYS 01 VIDEO https youtu be 5O4oYTvrHSc...

Page 5: ...nnection points should be marked After all marking process nished the connection had been made before should be disconnected and then drilling operations should be completed STEP 4 10 mm 0 254 nch DD...

Page 6: ...Page 5 STEP 4 10 mm 0 254 nch DD 01 x 11 STEP 5 VIDEO https youtu be ZLoblB_9C9g...

Page 7: ...ACCORD NG TO THE HE GHT MEASURMENTS G VEN ON THE S DE UPPER HOLES SHOULD BE DR LLED FOR ATTACH NG BED AT NEXT STEP SUPPLY DRYWALL FASTENERS APPROPPR ATE TO YOUR WALL TYPE WE RECOMMEND US NG STEEL TOG...

Page 8: ...Page 7 STEP 7 KVL 01 MNG 01 MNG 01 x 5 MNG 01 x 10 MNG 01 x 5 B C D MNX 03 x 10 KVL 01 x 4 KVL 01 x 4 MNX 03 210 210 210 VIDEO https youtu be MXxWZklhtWE...

Page 9: ...Page 8 MNG 01 x 6 KVL 01 x 3 A STEP 8 STEP 9 B C D KVL 01 MNG 01 210 210 VIDEO https youtu be T83F5yBtXls...

Page 10: ...Page 9 STEP 10 G R G L H K LTA 01 x 14 H K G R G L Install plastic corners and metal joints without gaps SKT 01 CTM 01 1 3 AL 01 H G R 2 VIDEO https youtu be DzmViqWnr_Q...

Page 11: ...D 69 mm 69 mm SC 110 x 10 VTB 02 x 20 SC 110 x 4 VTB 02 x 8 Assemble the brackets over the places shown over H K pro les Assemble the brackets over the places shown over G L G R pro les VIDEO https y...

Page 12: ...Page 11 STEP 12 Unscrew the Screws VIDEO https youtu be V6AFsdNAwRg...

Page 13: ...Page 12 STEP 13 VIDEO https youtu be LmG3kcJefIk LTA 01 x 14 B C D...

Page 14: ...Page 13 STEP 14 MNX 02 AMR 03 STEP 15 AMR 03 SG 01 MNX 02 x 12 VIDEO https youtu be hXwpV7j9RU...

Page 15: ...Page 14 STEP 16 STEP 17 IM 02 x 2 SC 78 AL 02 PL 04 YSB 01 SC 78 SC 78 KOR B VIDEO https youtu be p3YWPp5ZrpU...

Page 16: ...Page 15 STEP 18 AL 01 SC 79 CTM 04 AL 01 CTM 04 VIDEO https youtu be EGaL1sYfIF0...

Page 17: ...Page 16 STEP 19 AMR 03 SG 01 AMR 03 VIDEO https youtu be upmBP0y0oSI...

Page 18: ...Page 17 STEP 20 A A 210 MNG 01 X 12 VIDEO https youtu be yD7Z9EtV2FM...

Page 19: ...Page 18 STEP 21 VTD 02 x 4 SC 78 VIDEO https youtu be gTdJIDFx_LE...

Page 20: ...Page 19 STEP 22 KCE 01 X 4 TAP 01 VIDEO https youtu be c6WzdVZkD08...

Page 21: ...Page 20 STEP 23 1 BED CLOSED 2 BED OPEN VIDEO https youtu be 926K2b40iA...

Page 22: ...excess blankets before clos ng Th s keeps mechan sm free of obstruct ons and unnecessary stress 4 Do not lean or rest heavy objects on s des or top of furn ture Th s may cause balance ssues and compro...

Page 23: ...Page 22 10 For Bunk Beds a Always use prov ded ladder when access ng top bunk b Be slow careful and aware of surround ngs when open ng top bunk c Do not horseplay Beds are to be slept on only...

Page 24: ...www mult mobeds com...

Reviews: