5
Pipe installtion
1
. Set the toilet in position against the wall.
The floor must be even and insulated.
2. Measure and make a hole for the ventilation
pipe in the ceiling, 55 mm (2
1
/4'') diameter.
Install the ventilation pipe with the non-sleeved
end down inside the coupling on the toilet.
3. Measure and make a hole in the roof,
with 55 mm (2
1
/4'') diameter.
4. Push the pipe up through the hole. Seal it well
using asphalt sealant between the pipe and the
roof to prevent any leaks.
5. lnsulate the pipe from the ceiling up to the top.
All pipework in cold spaces must be insulated.
6. Cut the exterior pipe to fit the angle of the roof.
7. Push the roof flashing over the exterior
pipe. (Use soapy water to make it easier).
If you have a tin roof, the best thing to do
is to get a sheet metal worker to make
a junction between the roof and the
exterior pipe.
8. Put the exterior pipe over the ventilation
pipe's insulation and the reduction
coupling on top.
9. Adjust the roof flashing and seal firmly with
asphalt sealant between the roof flashing and
the roof.
1
0. Fit the insect netting against the stop on the
reducing coupling.
Starting of toilet
1
. Put about 2/3 of the bag of the Biolet humusstarter into the toilet, except to model 65 where the whole bag
should be used. About half of the Humusstarter falls directly through the grate into the humus tray.
2. Connect the main plug into an grounded wall socket. Push down the toilet seat, the compost cover (
1
5) opens,
which activates the mixer motor, The mixer will automatically start and make one turn, repeat this a couple of
times, in order to even out the humus starter.
3. Set the heating control (the recommended start setting, page 6).
The tray will be filled and should stay this way until the compost chamber is filled to
leveling arm (17a)
RESTART AFTER PERIOD OF NO USE
1
. Break up the old compost in the chamber with the manual rake, add some water to make it moist, before start
using the toilet.
2. Add some humusstarter to the compost.
3. Connect the plug.
18° C /
Vent alt
25 mm (1
1
/
4
”) Insulation
Pipecover 110 mm (5”)
Reducing coupling
Netting
Roof flashing
25 mm (1
1
/
4
”)
Insulation
Ventilation pipe
Radiator
55mm (2
1
/
4
”)
Wall bracket
65° F
Nonsleeved end
Sleeved end
Roof flashing
seal of asphalt
Roof
Min. 1 meter
(4') above roof
Min. 0,5 meter
(2') above roof
Max
1,5
meter
(5')
Vent
alt.
EN