It shall apply from:
03-02-2016 r.
ASSEMBLY INSTRUCTION
OF PEDAL-POWERED MERRY-GO-ROUND
2204A Pedal-Powered Duck Merry-Go-Round
2204B Cycle Merry-Go-Round
Page 1: ...It shall apply from 03 02 2016 r ASSEMBLY INSTRUCTION OF PEDAL POWERED MERRY GO ROUND 2204A Pedal Powered Duck Merry Go Round 2204B Cycle Merry Go Round ...
Page 2: ... OF CONTENTS INTRODUCTION 2 STAGE 1 preparatory work 3 STAGE 2 assembly of the construction 3 1 List of components 3 2 Assembly scheme 4 INTRODUCTION 2204A Max free fall height 0 46 m 2204B Max free fall height 0 55 m Depth of foundation 0 38 m Impact area Ø6 24 m 230 380 2042 O6240 Impact area ...
Page 3: ...s and the ground Foundations positions O1809 1 2 7 9 6240 1279 WARNING All installation activities shall be performed in accordance with health and safety standards A foundation setup tolerance is 50 mm STAGE 2 assembly of the construction 1 List of components No Name of component Dimension Qty 1 Pedal powered merry go round 1 2 Steel feet 4 3 Concrete foundation O 320 4D 4 4 Hexagon head screw M1...
Page 4: ...te depth Put the foundations into the holes Screw the feet to the track A A 1 5 1 9 7 6 8 2 1 2 2 1 1 Screw the device to the foundations B B 1 10 6 4 5 2 3 3 1 Level the construction and set its vertical alignment Check if the basic level mark coincides with level of the ground Remove the slacks in joints Fill the holes with soil compact it and level it with turf if any to the level of the ground...