5.  Assembly of frame profiles and panels 

Screen

refugio 2.0

LIGNODUR

When mounting the other profiles

pay attention to equal directions. 

For this purpose, a mark is made 

on the straight panels.

In the case of inclined panels, the 

direction arises as a result of the 

profile geometry. Complete the 

assembly with a frame profile.

    

 

cross-section

 

 

 

straight panel 

 

  

    

mark

The joint covering must end 8 mm below the top edge of the posts.

Please fix the post cap with a mounting adhesive (not supplied).

5.1

5.2

5.3.1

5.3.2

5.3.3

5.1 Checking the clearance

Always start the assembly process

with a frame profile. In order that

the profiles in the post have suffici-

ent splay to compensate for chan-

ges in length, the frame profiles 

and panels must be 55 mm longer 

(max.) than the clearance between 

the posts.

Example:

Clearance: 1580 mm =>

Profile length max. 1635 mm.

If necessary, shorten the profiles 

accordingly.

5.2 Assembly of the panels

5.3 Installation of the joint covering and post cap

Summary of Contents for LIGNODUR terrafina refugio 2.0

Page 1: ...Screen refugio 2 0 LIGNODUR Assembly instructions LIGNODUR terrafina Screen refugio 2 0 www terrafina de M A D E I N GERMANY...

Page 2: ...tional rules and regulations In addition to the specifications stated in these assembly instructions the applicable accident prevention regula tions related to the workplace and other national and loc...

Page 3: ...ncreting start middle post overall height 758 mm height above foundation 450 mm depth of concrete 308 mm Post supports for concreting corner post overall height 958 mm height above foundation 650 mm d...

Page 4: ...distance of the outer borehole to the edge of the foundation must be at least 50mm at reduced load and 180mm at maximum load When tightening the screws ensure the vertical orientation of the post supp...

Page 5: ...e profiles can be installed at this height For other heights refer to the following table Screen refugio 2 0 LIGNODUR 3 5 1 3 5 2 3 4 Alignment of the post supports Positioning and distancing 3 4 An a...

Page 6: ...4 3 Fixing the posts The filling profiles are inserted into the joints When using a joint covering see Installation of the joint covering the filling profile must be shortened to the dimensions indic...

Page 7: ...end 8 mm below the top edge of the posts Please fix the post cap with a mounting adhesive not supplied 5 1 5 2 5 3 1 5 3 2 5 3 3 5 1 Checking the clearance Always start the assembly process with a fra...

Page 8: ...2993 0 Fax 49 0 291 2993 99 info moeller profilsysteme de www moeller profilsysteme de M A D E I N GERMANY www terrafina de PEFC 04 31 1955 Authorised Dealer 6 6 Wall assembly 6 1 The post is attached...

Reviews: