T H E W O R L D P O W E R I N A N C H O R I N G S Y S T E M S
21 July 2011
www.muir.com.au
2
Contents
Introduction
page 3
Important Information
Safe Operation
Installation
page 4
Installation Instructions
Rope Chain Management System Installation
Page 5
Depth of the Chain Locker
Page 6
Handy Hints
Page 7
Electrical information
page 7
Circuit Breaker
Deck Switches
Isolating Switch
Batteries
Direction of Rotation
Solenoid Installation
Wiring Layout
Operation and Servicing
page 9
Operating Instructions
Anchoring
Retrieving chain
Rope hauling on the capstan
Electric/Hydraulic Operation
Auto Anchor Launching
Servicing Instructions
page 9
Maintenance and Assembly Instructions
page 10
Rope Chain Management System Adjustment
page 11
Manual Override System (MORS)
page 12
Troubleshooting
Page 13
Warranty and Warranty Registration Card
Page 14
Drawings
Deck Templates
Wiring diagram for 12/24V DC two pole motor
Wiring diagram for 12/24V DC three pole motor
Exploded views for
EasyWeigh VM500 and VMC500
Exploded views for
EasyWeigh VM650 and VMC650
Exploded views for
EasyWeigh VR1000 and VRC1200
Summary of Contents for Easy Weigh Series
Page 13: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ...WINDLASSES AUSTRALIA DNV Certification Pty Ltd JAS ANZ ...
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......