____________________________________________________________________________________________
____________________________________________________________________________________________
Copyright © Mugin Tech Ltd
www.muginuav.com
7. Fuselage installation.
A. Drilling is required for installing motors and pitot tube.
B. Make certain the drilling holes are in correct locations.
C. Install the sleeves before wiring.
D. Make certain the negative and positive are wired correctly.
E. Make the functions of all wires to avoid possible mistake.
F. Test before applying glue and sealing.