background image

Mueller, Inc. 9 x 12 Greenhouse Kit Instructions; For additional information, see the Greenhouse Installation Video

7

RAFTERS (R-1)

Bolts should remain loose until EC-1 is installed.

R-1

R-1

Place only 

inside bolt 

as shown.

Summary of Contents for 9x12 Greenhouse Kit

Page 1: ...ngineered structures and do not meet any specific building code criteria For video installation instructions visit our website at www muellerinc com downloads home videos home 877 2 MUELLER www muelle...

Page 2: ...ts please refer to the parts list on the itemized invoice delivered with your building All ciled on the inside of the channel purlin girts and rafters Example of this is below PG 2 Mueller Inc 6 x 9 D...

Page 3: ...he bottom Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw 12 12 12 36 1 TEK Screw For attaching sheet metal to purlin Skylight Screw Large Head...

Page 4: ...bent for a tight fit Spread apart as needed to nest the purlin into the channel BASE LAYOUT BC 1 AND BP 1 Leveling and proper blocking is critical for the base layout BC 1 Base Channel BC 1 Base Chann...

Page 5: ...Mueller recommends the building be placed on leveling blocks not included to support the base channel and purlins Mueller also recommends the building be anchored to the ground or foundation The meth...

Page 6: ...additional information see the Greenhouse Installation Video 6 ERECTING COLUMNS C 1 Attach column to MKB 1 Galvanized MKB 2 clip using 1 2 x1 Fin Head Bolts HINT Add clips to top of columns before st...

Page 7: ...Inc 9 x 12 Greenhouse Kit Instructions For additional information see the Greenhouse Installation Video 7 RAFTERS R 1 Bolts should remain loose until EC 1 is installed R 1 R 1 Place only inside bolt a...

Page 8: ...Mueller Inc 9 x 12 Greenhouse Kit Instructions For additional information see the Greenhouse Installation Video 8 EAVE CHANNEL EC 1 Tighten bolts after EC 1 is installed EC 1 EC 1...

Page 9: ...e Installation Video 9 MAKE SURE THE ASSEMBLY IS SQUARE AND LEVEL BP 1 BP 1 BC 1 BC 1 C 1 C 1 C 1 C 1 R 1 EC 1 EC 1 R 1 Make sure the assembly is square Assembly is square when the corner to corner me...

Page 10: ...Mueller Inc 9 x 12 Greenhouse Kit Instructions For additional information see the Greenhouse Installation Video 10 R 1 EC 1 EC 1 R 1 RP 1 RP 1 ROOF PURLIN Open side of RP 1 faces to center of building...

Page 11: ...eller Inc 9 x 12 Greenhouse Kit Instructions For additional information see the Greenhouse Installation Video 11 DOOR AND DOOR TRIM Notch and bend trim as shown J Trim TEK Screw Door Door Jamb TOP VIE...

Page 12: ...onal information see the Greenhouse Installation Video TEK Screws 12 MID GIRTS MG 1 MG 2 AND MG 3 To attach MG 3 use TEK screws to go through door trim door frame and girt NOTE Bolt to inside of colum...

Page 13: ...drip trim 1 1 1 ADD WINDOW Start sheet 1 in past steel line Sheet 1 above bottom of base channel NOTE Sheets below window will need to be field cut for window assembly from 3 8 panels Install one ful...

Page 14: ...on the bottom Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw 12 12 12 36 Lap TEK Screw Lap Strap on the bottom Skylight Screw Skylight Screw S...

Page 15: ...onal information see the Greenhouse Installation Video 15 1 SHEETING SIDEWALL Inside closure goes on the bottom and top of wall sheet Endwall Sidewall NOTE Start sheets 1 in from corner channel and st...

Page 16: ...ional information see the Greenhouse Installation Video 16 1 SHEETING ENDWALL Inside closure goes on the bottom and top of wall sheet Endwall Sidewall NOTE Start sheets 1 in from corner channel and st...

Page 17: ...1 17 SHEETING NOTE Make sure the frame is plumb and level and tighten all bolts prior to sheeting Repeat for each wall For side with door start sheets flush with J trim on both sides of the door NOTE...

Page 18: ...Mueller Inc 9 x 12 Greenhouse Kit Instructions For additional information see the Greenhouse Installation Video 18 CORNER TRIM Lap Strap on the bottom Use TEK screws to attach to frame...

Page 19: ...eo 19 BACK SIDE WALL Roof to wall sheet alignment Align major ribs from wall to major rib on roof Lap TEK Screw Lap Strap on the bottom Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skyl...

Page 20: ...N Use scaffold boards not included when installing roof panel sheets trim Wall Sheet Door Door NOTE Use TEK screws at the purlins Use Lap TEK screws every 20 vertically SIDE VIEW SIDE VIEW TOP VIEW In...

Page 21: ...on Video 21 ROOFING TRIM DETAILS CAUTION Use scaffold boards not included for support while installing roof sheets and trim Inside rake trim goes behind outside rake trim Outside Closures Door below t...

Page 22: ...e first to maintain pitch Install remainder of screws SKYLIGHT RIDGE ROLL INSTALLATION CAUTION Use scaffold boards not included for support while installing roof sheets and trim Install lap screws on...

Page 23: ...Mueller Inc 9 x 12 Greenhouse Kit Instructions For additional information see the Greenhouse Installation Video 23 TOTAL BUILDING MEASUREMENTS 12 4 9 7 7 1 7 7...

Reviews: