Mueller, Inc. 6 x 9 Greenhouse Kit Instructions; For additional information, see the Greenhouse Installation Video
1"
Lap TEK Screw
Eave Trim
DripTrim
Use
inside/outside
closures
behind drip
trim
1"
1"
13
ADD WINDOW
Start sheet 1" in from steel line. Sheet 1" above bottom of base channel
NOTE: Sheets below window
will need to be field cut
for window assembly
from 3'8" panels.
Install one full sheet,
then partial sheet.
Insert window and flap
flush to sheet. Add drip
edge window trim when
installing eave trim.
See installation
instructions included
with the window
packaging.