
4.3 Tasks after extended out-of-service periods (>3 weeks)
Tasks after extended out-of-service periods (>3 weeks)
Note:
Operate fuel treatment system for at least 5 minutes.
1.
Start up fuel treatment system (→ Page 43).
2.
Shut down fuel treatment system (→ Page 51).
MS150062/01E 2012-01 | Operation | 41
TIM-ID: 0000007730 - 005