background image

should be centered.

2. When placing the thermoblocks,

make sure the insert depth (the

distance between the edge of the

tube and outside edge of the outer

thermoblock) equals to L1 or L2.

Attention

: Incorrect thermoblock

position may cause tube failure

during the heat treatment, please

always follow the instructions

which are provided by MTI

Corporation for safe operation.

STEP 3

Connect the power cord of the furnace to the correct power source

1. Check the electrical ratings which are located in the label on the back of the furnace.

2. Make sure the power switch in the front panel is in the OFF position before connecting the furnace to the

power supply.

3. Consult a professional or licensed electrician to perform the power connections.

NOTE

: The plug does not come with the furnace. Please order it at our website.

US & Canada

Europe

STEP 4

Power on the furnace

Turn the LOCK switch clockwise to turn on the power of the furnace. Then press the green button to turn on

the relay.

STEP 5

Perform a test run on heating

Simply press and hold the RUN button of the temperature controller for 3 seconds. Then the furnace starts

running and heating up to 800

°

C. The heating program has been set up before we ship out our equipment.

The heating program is:

C 01

0

t 01

30

C 02

200

t 02

10

C 03

200

t 03

60

C 04

800

t 04

30

C 05

800

t 05

120

C 06

200

t 06

-121

Wait until the program stops. If the furnace gets trap in the halfway or problem was found after inspection.

Please contact us immediately.

TEL: (510) 525 – 3070

Email: [email protected]

Reviews: