should be centered.
2. When placing the thermoblocks,
make sure the insert depth (the
distance between the edge of the
tube and outside edge of the outer
thermoblock) equals to L1 or L2.
Attention
: Incorrect thermoblock
position may cause tube failure
during the heat treatment, please
always follow the instructions
which are provided by MTI
Corporation for safe operation.
STEP 3
Connect the power cord of the furnace to the correct power source
1. Check the electrical ratings which are located in the label on the back of the furnace.
2. Make sure the power switch in the front panel is in the OFF position before connecting the furnace to the
power supply.
3. Consult a professional or licensed electrician to perform the power connections.
NOTE
: The plug does not come with the furnace. Please order it at our website.
US & Canada
Europe
STEP 4
Power on the furnace
Turn the LOCK switch clockwise to turn on the power of the furnace. Then press the green button to turn on
the relay.
STEP 5
Perform a test run on heating
Simply press and hold the RUN button of the temperature controller for 3 seconds. Then the furnace starts
running and heating up to 800
°
C. The heating program has been set up before we ship out our equipment.
The heating program is:
C 01
0
t 01
30
C 02
200
t 02
10
C 03
200
t 03
60
C 04
800
t 04
30
C 05
800
t 05
120
C 06
200
t 06
-121
Wait until the program stops. If the furnace gets trap in the halfway or problem was found after inspection.
Please contact us immediately.
TEL: (510) 525 – 3070
Email: [email protected]