![MTD 19A30014OEM Operator'S Manual Download Page 9](http://html1.mh-extra.com/html/mtd/19a30014oem/19a30014oem_operators-manual_1851285009.webp)
9
S
ection
4 — A
SSembly
& i
nStAllAtion
6.
Install the bags onto the mounting frame as shown in
Figure 4-5. Simply place the leading edge of the bag onto
the front frame rail, then rock the bag backwards and down
into place. Repeat for the second bag.
1
2
Figure 4-5
7.
Remove the discharge chute, or mulch plug. Retain the
wing knobs for installation of the deck chute in Step 10.
8.
Insert the chute tube through the grass-catcher hood, in
the opening provided. It is easiest to feed the end of the
tube into the opening with the chute tube flipped upside
down, then rotating right-side once inserted into the hood.
See Figure 4-6.
Figure 4-6
9.
Mount the bagger chute tube to the deck of the tractor by
lowering the chute tube over the mounting bolts in the
mowing deck, as shown in Figure 4-7.
10. Secure the rear mounting bolt with a wing knob (1), then
the front mounting bolt with another wing knob (2) as
shown in Figure 4-7.
1
2
Figure 4-7