
Table of Contents
Location
Title
Section 1
General
1.00
1.10
Recommended Shipping & Storage
1.20
Drawings-Complete Pump Assembly
1.30
Drawings-Pump Assembly-Overall Dimensions
1.40
Drawing-Dual Pump Configuration-Overall Dimensions
1.50
Drawings-Gear Reducer Installation Positions
1.60
1.70
Section 2
Initial Inspection & Break-in
2.00
2.10
2.20
2.30
Start-up & Testing Considerations
2.40
2.50
Warm-up Prior to Rotating Pump
Section 3
Preventative Maintenance
3.00
3.10
First 100 Hours of New Pump Operation
3.20
Daily Preventative Maintenance
3.30
Weekly Preventative Maintenance
3.40
Every 100 Hours Preventative Maintenance
3.50
Every 250 Hours Preventative Maintenance
3.60
Yearly or as Required Preventative Maintenance
3.70
Summary of Contents for QI-1000
Page 7: ...1 20 Drawings Pump Assembly Overall Dimensions All Plunger Sizes TI 600 TRIPLEX...
Page 8: ...QI 1000 QUINTUPLEX...
Page 9: ...1 30 Dual Pump Assembly Overall Dimensions 1 30 1 600 HP Dual Pump Assembly Overall Dimensions...
Page 10: ...1 30 2 1000 HP Dual Pump Assembly Overall Dimensions...
Page 11: ...1 50 Drawings Gear Reducer Installation Positions 1 50 1 Gear Reducer Position Left Hand...
Page 12: ...1 50 2 Gear Reducer Position Right Hand...
Page 36: ......