
2-15
Hardware Setup
System Assembly Flowchart
The following flowchart shows basic system assembly procedures. Please note
that always wear anti-static gloves when handling electrical components and exer-
cise caution during the installation process. For more information, contact your local
dealer or experienced technician.
START
REMOVE CHASSIS COVER
INSTALL
CPU & HEATSINK
INSTALL
MEMORY MODULES
INSTALL
PCI EXPANSION CARDS
FINISH
INSTALL
HARD DISK DRIVES
CHECK IF ALL PARTS
ARE PROPERLY CONNECTED
REPLACE
CHASSIS COVER
92B9v1.0-2.p65
2008/9/8,
上午
10:02
15
PDF created with pdfFactory Pro trial version
www.pdffactory.com
Summary of Contents for PM-104 Series
Page 1: ...i PM 104 Series MS 92B9 1U Rackmount Server G52 92B91X2...
Page 5: ...v WEEE Waste Electrical and Electronic Equipment Statement...
Page 6: ...vi...
Page 7: ...vii...
Page 16: ...viii This page is intentionally left blank...
Page 46: ...viii This page is intentionally left blank...
Page 52: ...3 6 MS 92B9 Server Advanced CPU Configuration...
Page 65: ...3 19 BIOS Setup Boot Boot Settings Configuration...
Page 70: ...3 24 MS 92B9 Server Chipset North Bridge Configuration...