
2-10
Getting Started
MS-9A95
VESA Mount
Important
Installation
1. Connect your cables to the system.
2. Mount your system onto the VESA mount plate.
Removal
1. Dismount your system from the VESA mount plate.
2. Disconnect your cables from the system.
1. Locate the VESA mount screw holes on the back of the monitor.
2. Fasten the VESA mount plate to the monitor with the supplied screws.
3. Mount the system onto the VESA mount plate.
4. Tighten the thumbscrew at the bottom of the VESA mount plate to secure the
system.
5. Locate the wireless LAN antenna connector and install the antenna.
6. Connect the signal cable from the monitor to the system.
7. Connect the monitor power cord.
8. Assemble the system power adapter and the power cord. Connect the power
adapter to the system and then connect the power cord to the electrical outlet.
Important
We suggest that you connect the power adapter to your system first and then connect
the power cord to the socket-outlet for safety concerns.
9. Turn on the monitor and power on the system.
Summary of Contents for MS-9A95 WindBOX IV Advanced
Page 1: ...i MS 9A95 WindBOX IV Advanced Slim Fanless Box PC ...
Page 8: ...1 2 Overview System Overview h h System I O Controls 13 3 4 6 7 8 10 1 9 2 5 12 11 13 14 1 ...
Page 23: ...2 9 MS 9A95 4 Fasten the HDD bracket to the system with 2 screws ...
Page 26: ......
Page 49: ...2 A 1 This appendix provides the sample codes of WDT Watch Dog Timer Appendix ...