
2-7
Getting Started
MS-9A66
7. Place the thermal pad onto the HDD. Check the following picture for
the exact location of the thermal pad. Once the thermal pad is secured,
peel off the yellow protective film.
8. Fit the HDD into the mounting
bracket.
9. Once the HDD has been securely installed, place the HDD set back to
the system. Make sure the HDD set is correctly oriented. Fasten the
HDD set to the system with screws.
Summary of Contents for MS-9A66
Page 1: ...i MS 9A66 Industrial Data Machine...
Page 8: ......
Page 19: ...1 11 MS 9A66 Block Diagram MS 9A66 Q87 MS 9A66 C226...
Page 20: ...1 12 Overview Motherboard Jumpers JCMOS1 JAT1 JME1 JCOMP1...
Page 22: ...1 14 Overview ME Overview h h System Dimensions without Wall Mount...
Page 23: ...1 15 MS 9A66 h h System Dimensions with Wall Mount...
Page 24: ...1 16 Overview...
Page 28: ...1 20 Overview h h MS 9A66 C226 PCIe Card Dimensions 9A66 P1 15...
Page 30: ...1 22 Overview P1 17 PCI2 Card Dimension Limitation with 2 HDDs installed...
Page 31: ...1 23 MS 9A66 h h Mounting Brackets...
Page 32: ...1 24 Overview Mounting Bracket Screws Installation 1...
Page 33: ...1 25 MS 9A66 Installation 2...
Page 34: ......
Page 37: ...2 3 MS 9A66 3 Push the top cover gently forward 4 Remove the top cover from the system...
Page 53: ...2 19 MS 9A66 4 Connect the fan power connector to the motherboard...
Page 96: ......
Page 102: ......