32
Overview of Components
V-Check Points Lite
These voltage checkpoints are used to measure the current system voltages. A
multimeter (not included) will be required to check voltages. To measure voltage,
place test leads on the GND (screw mounting hole) and a specific V-Check Point.
Please refer to the manual of your multimeter for more information.
VCCIO
VCCIO2
GND
VSA
DRAM
VCORE
T_SEN1: Thermal Sensor Connector
This connector allows you to connect the thermistor cable and use it to monitor the
temperature of the detection point.
Thermistor cable
GND
Sense
Summary of Contents for MEG Z590 ACE
Page 9: ...IX Quick Start Connecting Peripheral Devices 周辺機器の接続 주변 장치 연결하기 連接周邊設備 连接外围设备 ...
Page 10: ...X Quick Start 4 3 1 2 Power On 通電 전원 켜기 啟動電源 开机 ...
Page 64: ...54 UEFI BIOS NOTE ...
Page 118: ...54 UEFI BIOS NOTE ...
Page 172: ...54 UEFI BIOS NOTE ...
Page 190: ...18 背板 I O 安裝天線 1 將天線連接至底座上 2 將兩支天線鎖緊至 WiFi 天線接頭上 如圖所示 1 2 3 盡量將天線放置在高處 ...
Page 226: ...54 UEFI BIOS NOTE ...
Page 244: ...18 后置 I O 面板 安装天线 1 将天线与底座组合在一起 2 将两根天线电缆拧紧至 WiFi 天线接口 如图所示 1 2 3 请将天线尽量放置更高 ...
Page 280: ...54 UEFI BIOS NOTE ...