
2-5
Hardware Setup
6. C over t h e l oad p l at e on t o t h e
package.
5. Visually inspect if the CPU is seated
well into the socket. If not, take out
the CPU with pure vertical motion and
reinstall.
7. Press down the load lever lightly onto
the load plate, and then secure the
lever with the hook under retention
tab.
8. Align the holes on the mainboard with
the heatsink. Push down the cooler
until its four clips get wedged into
the holes of the mainboard.
Important
1. Confirm if your CPU cooler is firmly installed before turning on your system.
2. Do not touch the CPU socket pins to avoid damaging.
PDF created with pdfFactory Pro trial version
www.pdffactory.com
Summary of Contents for 5520 Master Series
Page 1: ...i 5520 Master Series MS 91C2 V1 X Server Board G52 91C21X1...
Page 5: ...v WEEE Waste Electrical and Electronic Equipment Statement...
Page 6: ...vi...
Page 7: ...vii...
Page 12: ...MS 91C2 Server Board 1 4 5520 Master Series MS 91C2 V1 X Server Board Mainboard Layout...
Page 46: ...3 18 MS 91C2 Server Board Boot Boot Settings Configuration...