
4 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
32
4349312/01 EN
VACUTAP
®
VV
®
4.1.2 Bleeding on-load tap-changer head and suction pipe
4.1.2.1 Bleeding on-load tap-changer head
1. Open all forward and return valves in the pipe system.
2. Remove screw cap on air-vent valve E1 on the on-load tap-changer head
cover.
Figure 18: Air-vent valve E1
3. Use screwdriver to lift valve tappet on air-vent valve E1 and bleed on-load
tap-changer head.
Figure 19: Valve tappet
4. Seal air-vent valve E1 with screw cap (tightening torque 10 Nm).