16
Fluid/Assembly Preparation and Analysis
35. Start the test.
The Bottle Sampling Test is a three test analysis, as described in the contamination
monitoring product user guide.
36. Upon test completion (after the emptying cycle is completed) switch OFF the
bottle sampler.
37. Turn the operating mode selector slowly to Vacuum (the position nearest the yel-
low disc marked V). This vents the pressurised chamber to atmosphere.
Ensure
that the visiwink indicator is green before removing the top chamber.
38. Remove the top chamber and remove the sample bottle.
Note: Do not allow fluid to drip from the dip tube onto the pressure/vacuum
port. The pressure/vacuum port is the small vertical hole that can be seen in
the base unit after the top chamber has been removed.
39. If you have other samples to analyse, as long as the specification of the fluid is
the same, you can repeat the steps above without carrying out the flushing proce-
dure. If, however the fluid specification is different then it is recommented that
the flushing procedure is followed before performing further testing.
40. Switch OFF the contamination monitoring product.