background image

- 3 - 

LED 

Color  Function 

Off 

Gateway is waiting for the PROFIBUS token 

Ethernet 

Amber 

Steady: 10Mbps, no data is transmitting 
Blinking: 10Mbps, data is transmitting 

Green 

Steady: 100Mbps, no data is transmitting 
Blinking: 100Mbps, data is transmitting 

Off 

Ethernet cable is disconnected 

 

Reset Button 

The reset button is used to load factory defaults. Use a pointed object 
such as a straightened paper clip to hold the reset button down for five 
seconds. Release the reset button when the Ready LED stops blinking. 

Hardware Installation Procedure 

STEP 1

:

 

Connect the power adapter. Connect the 12-48 VDC power line 
or DIN-rail power supply with the MGate 5101-PBM-MN 
device’s terminal block.

 

STEP 2

:

 

Use a PROFIBUS cable to connect the unit to a PROFIBUS slave 
device.

 

STEP 3

:

 

Connect the unit to the Modbus TCP device.

 

STEP 4

:

 

The MGate 5101-PBM-MN series is designed to be attached to 
a DIN rail or mounted on a wall. For DIN-rail mounting, push 
down the spring and properly attach it to the DIN-rail until it 
“snaps” into place. For wall mounting, install the wall-mount 
kit (optional) first and then screw the device onto the wall. 

 

 
 
 
 
 
 
 
 
 

Reviews: