STEP 6: PASSING THE STEEL CABLE OF THE TOWER (CONTINUATION)
25
Steel cable
Continuation of the passage of the steel cable.
ATTENTION!
Assembly of the steel cable
1- Make sure that the steel cable is correctly placed in the correct
position as shown on the right side.
2- The cable must not be in contact with the metal structure.
3- If the steel cable is damaged in the way it should not be used,
contact the authorized site for further details.
ASSEMBLY
Summary of Contents for EDGE BAIXA
Page 6: ...INSTRUÇÕES Posicionamento dos adesivos na máquina 6 ...
Page 7: ...Posicionamento do adesivo chart de instrução INSTRUÇÕES 7 PUXADA ALTA BAIXA 50 mm 10 mm ...
Page 40: ...INSTRUCTIONS Placement of stickers on the machine 6 ...
Page 41: ...7 PUXADA ALTA BAIXA INSTRUCTIONS Placement of stickers on the machine 50 mm 10 mm ...
Page 66: ...WARRANTY 32 ...
Page 74: ...INTRODUCCIÓN Posición de los adhesivos en la máquina 6 ...
Page 75: ...7 PUXADA ALTA BAIXA INTRODUCCIÓN Posición de los adhesivos en la máquina 50 mm 10 mm ...
Page 100: ...GARANTIA 32 ...