background image

Assembly Guide

SRD-800/U12

www.mnmounting.com
[email protected]
2 Merezhna str., Bila Tserkva, 

Kyiv region, 09100, Ukraine

Assembly components:

1

Frame top SRD-800 - 1 pcs

2

3

5

4

Rack Pillar SRD-800 U12 - 4 pcs
Side panel U12 - 2 pcs

Frame bottom SRD-800 - 1 pcs

6

Cable channel U12 - 2 pcs

Vertical profile

 U12 - 4 pcs

7

8

9

10

Glass door U12 - 1 pcs
Blind door U12 - 1 pcs

Leg M10x30 - 4 pcs

Screw M6x16 DIN 912 - 16 pcs

1

2

3

4

5

6

7

8

9

10

SAFETY INSTRUCTIONS

1. Entrust mounting equipment only to 

experienced professionals and strictly follow 

the providedv safety instructions. Improperly 

installed equipment may result in property 

damage, personal injury and/or liability for the 

installing contractor.

2. Only use appropriate fastening hardware.
3. Always make sure to securely use and lock 

all mounting bolts. Loose bolts may become 

unscrewed over time due to vibration which 

will then create a safety hazard.

11

Hex key 5 mm - 1 pcs

Reviews: