
11
Copyright 2005-2011 Mountain Models
TAIL FEATHERS ASSEMBLY:
1.
Locate and remove the V1 to V7 parts on the 1/8” sheet. They are all on one sheet in the lower left corner. Assemble V1, V2, and
V3 over the plan sheet, and secure with thin CA.
2.
Place V7 in position as shown below, but do NOT glue it yet. Make sure it is pushed up against V1.
3.
Assemble V6 as shown below, but do NOT glue it yet. Make sure the tabs from V1 and V2 are pushed fully into V6.