Mo
7
odel EA
7. Ma
CAU
7.1. Pe
Periodic
years of
Periodic
* Follow
air leak
Check it
Pneumati
c pa
rt
P
R
P
G
G
uidi
ng p
art
F
C
S
* For filte
a year)
A10S
ainte
UTION
riodic c
c maintenanc
f this produc
c checking sh
wing items sh
kage, etc.
tems
ressure gaug
Restriction (fix
ilot valve
Gasket
eedback leve
Connector pin
pring to fix p
er regulator, p
) should be d
enanc
Mainten
shall be
location
checkin
ce and chec
ct.
hould be con
Chec
ould be chec
ge
xed aperture
er
n
pin
periodic blow
done.
ce
nance work
surely condu
.
g
king will con
nducted refer
cklist of
cked after co
Period
1.0
)
wing of drain
- 59 -
which accom
ucted after th
ntribute to pr
rring to the fo
f period
onfirming the
of checking
2.
(approx. onc
mpanies par
he positioner
evention of n
ollowing che
dic chec
ere is no dam
(year)
.0
Pres
Chec
(clea
Chec
Exch
the p
Pres
Pres
Pres
ce in half a y
rts exchange
r is brought to
nonconforma
cklist of perio
cking
mage or abno
ence of dam
ck of clogging
aning, exchan
ck of operatio
hange the ga
pilot.
ence of wea
ence of wea
ence of wea
year) and cle
e and repair
o a nonhaza
ance and inc
odic checkin
ormality in ap
Remark
mage, check o
g and contam
nge)
on (exchang
asket when e
ar
ar
ar
eaning of filte
work
rdous
creased dura
g.
ppearance, ru
of accuracy
mination
e)
exchanging
er (approx. on
able
ust,
nce
Summary of Contents for EA10S
Page 67: ...Mo odel EA A10S 63...