Required Documentation
68P64115A21–B
Sept 2003
1X SC 4812T-MC Multicarrier BTS Optimization/ATP
1-13
Required Documentation
Required Documents
The following documents are required to perform optimization of the
cell site equipment:
S
Site Document (generated by Motorola Systems Engineering), which
includes:
– General Site Information
– Floor Plan
– RF Power Levels
– Frequency Plan (includes Site PN and Operating Frequencies)
– Channel Allocation (Paging, Traffic, etc.)
– Board Placement
– Site Wiring List
– CDF or NECF files (bts–#.cdf or bts–#.necf and cbsc–#.cdf)
S
Demarcation Document (Scope of Work Agreement)
S
Equipment Manuals for non-Motorola test equipment
Related Publications
Additional, detailed information about the installation, operation, and
maintenance of the 1X SC
t
4812T–MC BTS and its components is
included in the following publications:
S
SC Product Family Frame Mounting Guide
– 68P09226A18
S
1X SC 4812T-MC BTS Hardware Installation
– 68P64115A19
S
1X SC 4812T-MC BTS FRU Guide –
68P64115A20
S
WinLMF On-Line Help SR2.16.x
– 68P09257A16
S
LMF CDMA CLI Reference SR2.16.1.x –
68P09255A76
S
Cisco MWR 1941 Router Hardware Installation Guide, 78–15827–01
S
Cisco MWR 1941 Router Software Guide, 78–xxxxx–01
Intended Reader Profile
The information in this manual set is intended for use by the cellular
communications craftsperson(s) in the initial installation and
configuration, as well as the day-to-day operation and maintenance of a
BTS.
The user of this information has a general understanding of telephony, as
used in the operation of the Public Switched Telephone
Network (PSTN), and is familiar with these concepts as they are applied
in the cellular and maintenance mobile/portable radiotelephone
environment.
The user also needs a working knowledge of Windows 98
™
or
Windows 2000
™
.
1