6880309U09-A
October 26, 2007
Disassembly/Reassembly Procedures
: Replacement Procedures
6-17
4. Using a CR-V PH2 torque driver, fasten the 2 binding head screws M3x6 SUS [6] to the front
panel [4] as shown in
. (Torqued to 3.5–4.6 kgf*cm/ 3–4 in. lbs).
Figure 6-29. Installing Front Panel Screws
5. Carefully lay the top of the radio facing downward on a clean, flat surface.
6. Using a CR-V PH2 torque driver, fasten the 2 binding head screws M3x6 SUS B [9] with
2 o-ring [10] to the front panel as shown in
. (Torqued to 3.5–4.6 kgf*cm/
3–4 in. lbs).
Figure 6-30. Installing Bottom Screws to Front Panel
7. Lay the top of the radio facing upward.
8. Place the top cover [24] on the chassis [11] and seat it properly. Compress the cover and
chassis together to squeeze the foam [25] into place and to make torquing the screws easier.
1
2
1
2
Summary of Contents for PM1200
Page 1: ......
Page 2: ......
Page 6: ...iv Notes ...
Page 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Page 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Page 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Page 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Page 137: ......