Ground Based Access Point (GAP) Hardware Installation
Mounting and bolt congurations
Due to the weight of the GAP components and rack, the supporting structure (oor
deck) must be able to withstand at least 1000 lbs (500 kg). A structural oor support,
such as an iron I-beam, underneath the wooden oor is recommended.
Refer to
for a typical cross - section of the wooden floor bolt mounting to the GAP
cabinet or rack mounting brackets.
Figure 4-2
Wooden oor mounting
ti-cdma-05743-wd.eps
SMALL FLAT
WASHER
M12 X 100 BOL T
INSULATING
WASHER
(OPTIONAL)
LARGE FLAT
WASHER
MOUTING
BRACKET
ISOLATION
PAD
MOUNTING
STRUCTURE
(I BEAM)
M12 NUT
LOCK WASHER
SMALL FLAT
WASHER
(AFFIXED TO
BRACKETS)
PRELIMINARY ILLUSTRATION
68P09286A73-1
4-7
PRELIMINARY - UNDER DEVELOPMENT
JUL 2007
Summary of Contents for MOTOwi4 25600
Page 9: ...List of Figures vi 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 11: ...List of Tables viii 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 27: ...FCC requirements 16 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 28: ...Chapter 1 Overview 68P09286A73 1 1 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 84: ...Chapter 6 Optional Equipment 68P09286A73 1 6 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 86: ...Chapter 7 What s Next and Cleanup 68P09286A73 1 7 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 94: ...Chapter 8 XXXXXXXXXXXX 68P09286A73 1 8 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 96: ...Chapter 9 XXXXXXXXXXXX 68P09286A73 1 9 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 98: ...Chapter 10 XXXXXXXXXXXX 68P09286A73 1 10 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 100: ...Chapter 11 XXXXXXXXXXXX 68P09286A73 1 11 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 103: ...A 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 105: ...B 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 106: ...Appendix C MMI Cable Fabrication 68P09286A73 1 C 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...