Installation
46
7 Installation
Motorola recommends that only qualified personnel undertake the installation of a PTP 500 Series
Bridge solution.
7.1
Preparation
Before proceeding with the installation you should:
•
Check the contents of all packages against the parts lists shown in the packing list.
•
Ensure that you have the correct tools for the job.
•
Ensure that you are qualified to undertake the work.
•
Ensure that you have taken the correct safety precautions.
•
Have completed the site planning as described in
“Site Planning”.
7.2
Installation Procedure
The 500 Series installation procedure consists of the following steps:
•
Mounting the ODUs,
“Mounting the ODUs”
•
Connecting up,
“Connecting Up”
•
Mounting the PIDU Plus Units,
“Mounting the PTP 500 Series Bridge PIDU
Plus”
•
Mounting the Lightning Protection Units,
“Fitting a Lightning Protection Unit”.
•
Powering Up,
“Powering Up”
•
Aligning the ODUs,
“Aligning the PTP 500 Series Bridge ODUs”
7.3
Tools Required
The following specific tools are required to install a PTP 500 Series Bridge in addition to general
tools:
•
13mm Spanner / Wrench
•
RJ45 Crimp Tool
•
IBM Compatible Personal Computer (PC) running Windows 98 or later with 10, 100 or
1000BaseT Ethernet (Ability to change IP settings easily is recommended)
•
Either Internet Explorer version 6 or higher, or FireFox 1.5 or higher are recommended.
•
Ethernet patch cable
7.4
Installation Support
Online installation support and contact details for your regional support can be found at
. A Frequently Asked Questions (FAQ) section can be found
in
“FAQs”.
Summary of Contents for MOTOWI 4
Page 1: ...PTP 500 Series User Guide phn 1115 000v001 ...
Page 74: ...Web Page Reference 74 Figure 37 Save Configuration File Screen ...
Page 100: ...Web Page Reference 100 Figure 59 Spectrum Management as seen from the Master ...
Page 112: ...Web Page Reference 112 Figure 68 Remote Management ...
Page 197: ...Glossary 197 UTP Unshielded Twisted Pair VLAN Virtual Local Area Network ...