1-8
Computer Group Literature Center Web Site
Hardware Preparation and Installation
1
Hardware Installation
The following sections discuss the installation of memory modules, hard
drives, and mezzanine cards on the CPIP5430 base board, the installation
of the complete assembly into a chassis, and the system considerations
relevant to installation. Before installing the CPIP5430, make sure that the
serial ports and all jumpers are properly configured.
In most cases, memory modules and hard drives are already in place on the
base board. The user-configured jumper, E4, is not easily accessible with
a module installed. If you need to place a jumper, removing the module
may be necessary.
Should it be necessary to install modules on the base board, refer to
for a description of the procedure.
Configuring Headers
The following headers that can be configured are the Ethernet signal
header (E4) and the 12 volt power for USB control to the RTM (E1). Please
refer to the following figures and the next table for jumpering information.
Jumpering Diagram for Header E4
4273 0404
U27
J14
U30
U29
J17
J16
1
3
2
4
E4