AP 7181 Access Point:
Installation Guide
24
2.12 Field Installation
•
Only trained and qualified personnel should install this equipment.
•
Only a licensed electrician should install power cable / energize circuits.
•
All device wiring must follow the National Electric Code (NEC) or wiring
requirements in the country of installation. All location building and structure
codes must be observed.
•
Ensure that the power source for the AP 7181 is de-energized prior to installation.
•
Avoid exposure to high voltage power sources.
•
Avoid contact with overhead power lines.
•
Avoid falling tools or equipment.
•
Be aware of vehicular traffic in the vicinity of the work area.
CAUTION
Observe the following precautions to avoid damage to the unit
during installation.
WARNING!
Observe the following safety precautions to avoid personal
injury during installation.
WARNING!
When disconnecting the antenna cables from the unit or
removing an antenna panel and replacing it with a Blank panel,
terminators MUST be placed on the unused connectors on the
top of the unit.
CAUTION
It is also recommended that the antenna cable connectors and
terminators on the horizontal and vertical connectors on the top
of the AP 7181 be wrapped with both mastic tape and electrical
tape.
!
!