Version 1.5
© Openpath 2021
11
a.
Openpath 4-Port Expansion
b.
Openpath 8-Port Expansion
c.
Openpath 16-Port Elevator
4. A description will appear in green. Click
Save
.
PROVISIONING STEPS
To provision the SDC using the Open Admin app:
1. If powering using PoE, plug in Ethernet; if powering with an
external power supply, plug in Ethernet and connect power to
POWER IN
a. The Status LED will be
solid cyan
2. In the Open Admin app, locate the org to which you're
provisioning hardware, either on the list or using search, then tap
on the org name
3. Wait until the Status LED is
solid blue
, then press the Admin button
) on the SDC
c.
Note
: SDC will disconnect from the Open Admin app after 5
minutes of inactivity; press the Admin button again to reset
the timer
4. When the Status LED is
blinking purple
, In the app, tap on the last
four digits of the serial number for the SDC
5. When the Status LED changes to
solid purple
, tap
Test Internet
Connection
and wait for a green
YES
to appear before
proceeding with the next step
e.
Note:
This checks if the ACU/SDC can ping
6. If this step fails, refer to
6. If the Internet connection test is successful, tap
Provision Device
in the app