Motorline professional MPIE5 Installer And User Manual Download Page 6

5A

5B

2

1

B

A

 

 

 

 

 

 

 

 

C

b

a

EN

EN

02. AUTOMATISM 

DIMENSIONS

400

600

800

• Dimension (a)

1040mm

1250mm

1450mm

• Dimension (b)

870

mm

1080

mm

1280

mm

• Dimension (c)

370mm

570mm

785mm

03. INSTALLATION

AUTOMATISM INSTALLATION

400mm
204mm

250mm

290mm

150 ~ 200mm

450 ~ 500mm

CREATE FOUNDATION

Drill a hole on the ground, with the necessary 

dimension for the placement of the pillar, 

taking into account the table on page 5A.

APPLY CONCRETE

Apply the concrete at the bottom of the hole.

2

1

Before any installation step, 

check and make sure that the cable inside the automation 

is in accordance with

 image A, 

well-adjusted to the support.

cable

cable

The cable 

cannot 

have too much slack 

inside the automation or wrapped around 

the motor support rod 

due to the risk 

of crushing by the stoppers

 as shown in 

figure B.

Summary of Contents for MPIE5

Page 1: ...v1 3 REV 11 2022 MPIE10 MPIE10 EN INSTALLER AND USER S MANUAL...

Page 2: ...erial controls etc should not be disposed of as other household waste at the end of its useful life To avoid possible harm to the environment or human health resulting from the uncontrolled disposal o...

Page 3: ...persons with experienced in terms of usage of the product in a safe manner and who understands the risks and dangers involved Children shouldn t play with the product or opening devices to avoid the...

Page 4: ...tion unlocktheautomatism turn off the power and do not use it until all safety conditions have been met In the event of tripping of circuits breakers of fuse failure locate the malfunction and solve i...

Page 5: ...eight 35Kg 40Kg 45Kg Power Supply 24 Vdc Power 150W Nominal power consumption 3A Operating Temperature 20 50 C Material of the moving piece 2 5mm Stainless steel Cover Non slip 4mm Stainless steel Mat...

Page 6: ...with the necessary dimension for the placement of the pillar taking into account the table on page 5A APPLY CONCRETE Apply the concrete at the bottom of the hole 2 1 Before any installation step check...

Page 7: ...LLATION At the base of the pillar place a tube for draining waste water with a minimum inclination of 10 Provide a tube to pass the electric cable to the control board Place sand around the pillar for...

Page 8: ...On there is some security systems malfunction photocells safety edges If START circuits LEDs are turn Op and Cl there is a control device sending permanent signal 3 If the pillar work the problem is o...