15
14
Water
Connection
Firstly, make sure the
connector is facing the
right way. The white collar
of the connector should
point towards the jet and
flow of water.
Push the water pipe
into the connector until
the pipe stops, roughly
7mm. To separate the
connection, with two
fingers, push the white
collar towards the black
housing and pull the
pipe out.
The blue switch operates
the pump, this is a
demand switch and
needs to be held down to
operate the pump. When
the button is released the
pump will switch off.
Pump
Switch
Preparing The
Chemical
Fill the bottle with your
preferred chemical* up
to the neck of the bottle.
Screw the cap into place,
being careful not to cross
thread it.
Slip the bottle into the
bottle pouch on the
harness.
HOW TO PRIME THE PUMP
1. Put the backpack on.
2. Fill the bottle with
clean water and insert
the water pipe with
the filter, but leave the
cap off loose.
3. Connect the electrical
connection on the
machine.
4. Disconnect the
backpack water
pipe from the black
check valve and insert
this into the top of
the bottle, this will
re circulate the fluid.
5. Hold down the blue
switch until fluid starts
flowing. The pump
will go through the
following stages:
•
Air
- Trapped air starts
to work through the
system. High pitch
pump noise with drips
from the pipe.
•
Water
- The pump
will start to take
water into the system.
Pump noise deepens
with weak spray from
the pipe.
•
Primed
- The pump
will make a deep
continuous hum, you
will see high pressure
water coming from the
jet.
6. When you request
water, it should be
an instant start / stop
of water flow with a
constant high pressure
flow.
The first prime can take up
to 2 minutes to complete.
Further primes will take
approximately 30 seconds
using this method. A
prime will need to be
carried out before each
use.
This process should also be
used to rinse out chemical
after every use.
Prime The
Pump
Every MotorScrubber JET3 and STORM
®
is thoroughly tested in our factory before
dispatch. It is possible during storage and transport an airlock will have developed in the
pumping system. To release any airlocks present, you can follow the priming steps below
before the JET3 and STORM
®
can be used. The initial prime takes roughly 2 minutes
to complete.
JET3
STORM
®
JET3
STORM
®
*
PLEASE NOTE:
Ensure preferred chemical is non flammable.
Summary of Contents for STORM JET3
Page 1: ...User Manual English...