
Motion MCW with MediaWave Computer
– Installation and Assembly Procedure
ii
Document No. 002-15-0010
Motion Proprietary & Confidential
Copyright © 2009 Motion Computing, Inc. as an unpublished work
Table of Contents
REVISION HISTORY ................................................................................................................................................ I
TABLE OF CONTENTS ...........................................................................................................................................II
1.
BASE WITH POWER SUPPLY SHROUD INSTALLED ............................................................................. 1
1.1
R
EMOVE THE PLASTIC
S
HROUD THAT COVERS THE POWER SUPPLY
.................................................................. 1
2.
COLUMN ASSEMBLY ..................................................................................................................................... 1
2.1
L
AY BASE ON ITS BACK
.................................................................................................................................... 2
2.2
P
OSITION COLUMN ABOVE BASE
....................................................................................................................... 2
2.3
I
NSERT BOLTS THROUGH THE BOTTOM OF THE CART INTO THE COLUMN
.
T
HREAD EACH BOLT BEFORE FULLY
TIGHTENING ANY BOLT
.
T
IGHTEN ALL FOUR BOLTS
. ........................................................................................ 3
2.4
S
ET CART UPRIGHT
........................................................................................................................................... 3
2.5
R
EMOVE ONE SCREW AND LOOSEN THE OTHER SCREW OF THE COLUMN TOP PLATE
......................................... 4
2.6
I
NSERT DECORATIVE COVER IN THE BACK OF THE COLUMN CHANNEL GROVES
. ............................................... 4
2.7
S
LIDE DECORATIVE COVER DOWN TO WITHIN
24
INCHES OF THE BASE
............................................................. 4
2.8
R
OUTE CABLES BEHIND THE DECORATIVE COVER
............................................................................................ 5
2.9
S
LIDE DECORATIVE COVER TO THE BOTTOM OF THE COLUMN
.......................................................................... 5
2.10
H
OLDING CABLE IN THE CHANNEL AND INSERT SECOND DECORATIVE COVER IN THE BACK COLUMN CHANNEL
GROVES
............................................................................................................................................................ 5
2.11
S
LIDE THE DECORATIVE COVER DOWN SO IT TOUCHES THE FIRST COVER
......................................................... 6
3.
INSTALLING THE WORK SURFACE AND DRAWER ............................................................................. 6
3.1
R
EMOVE THE DRAWERS BY PRESSING THE PLASTIC RELEASE TABS ON THE INSIDE OF THE DRAWER GLIDE
RAILS
................................................................................................................................................................ 6
3.2
N
OTE WHERE THE
A
LLEN SET SCREWS ARE LOCATED
...................................................................................... 7
3.3
S
LIDE THE WORK SURFACE DRAWER ASSEMBLY MOUNTING BRACKET INTO THE ADJUSTABLE RAIL LOCATED
ON THE FRONT COLUMN
................................................................................................................................... 7
3.4
S
LIDE THE WORK SURFACE DRAWER ASSEMBLY DOWN THE RAIL TO ABOUT
2
INCHES
(4.4
CM
)
FROM THE
BOTTOM OF THE RAIL
. ...................................................................................................................................... 7
3.5
T
IGHTEN THE SET SCREWS
................................................................................................................................ 8
3.6
F
ULLY TIGHTEN THE SET SCREWS
..................................................................................................................... 8
3.7
R
EINSTALL THE DRAWER BY SLIDING IT ONTO THE DRAWER RAILS
.................................................................. 9
4.
ASSEMBLE THE CPU/MONITOR VESA MOUNT ASSEMBLY ............................................................ 10
4.1
A
TTACH METAL SPACERS TO THE FRONT
CPU
VESA
M
OUNT PLATE CORNERS
............................................. 10
4.2
P
LACE NYLON SPACERS OVER THE
M
ONITOR
VESA
M
OUNT PLATE THREADED INSERTS WHERE ARROWS
INDICATE
........................................................................................................................................................ 10
4.3
I
NSERT SCREWS THROUGH THE FRONT
CPU
VESA
M
OUNT PLATE HOLE AND THROUGH THE NYLON SPACERS
,
THREADING THEM INTO THE
M
ONITOR
VESA
M
OUNT PLATE THREADED INSERTS
........................................ 11
4.4
A
TTACH THE
F
LUSH
T
ILTING
VESA
M
OUNT BRACKET TO THE BACK
CPU
VESA
M
OUNT PLATE
................ 11
4.5
P
LACE THE
M
EDIA
W
AVE
C
OMPUTER ONTO THE FRONT
CPU
VESA
M
OUNT PLATE
,
EVENLY SPACED
BETWEEN THE METAL SPACERS AND CONNECTORS FACING DOWN
................................................................. 11
4.6
A
TTACH THE BACK
CPU
VESA
M
OUNT PLATE TO THE FRONT
CPU
VESA
M
OUNT PLATE
,
USING THE
THREADED METAL SPACERS ATTACHED TO THE FRONT PLATE
........................................................................ 12
5.
INSTALL THE MONITOR/CPU MOUNT ASSEMBLY BY SLIDING THE FLUSH TILTING VESA
MOUNT BRACKET INTO THE FRONT OF THE COLUMN RAIL ...................................................... 12
5.1
P
OSITION THE
VESA
M
OUNT BRACKET ABOUT ONE INCH FROM THE TOP OF THE COLUMN RAIL AND SECURE
BY TIGHTENING THE SET SCREWS
................................................................................................................... 13
6.
ASSEMBLE THE BATTERY GAUGE HOUSING ..................................................................................... 13