2. Operation Instruction
3
1) Start-up stage: when the Clean-Z powered
on, there is 1 minute for preparation with
single beep, and LED slow flashing red with
no ozone produced.
2) Cleaning stage: after start-up stage, the
Clean-Z will start to produce ozone, and
work continuously for 30 minutes with red
LED cycling from LED to .
3) Fresh air stage: the Clean-Z will stop prod-
ucing ozone with green LED rolling cycling
from LED to , and the fan will run for 5
minutes to flush residual ozone.
4) Cleaning complete: the Clean-Z will stop
working automatically with 3 green LED ON
and 3 beeps.
1
1
3
1
3