ASSEM8LY
<
>
Start
by grouping
all
element
sections
according
to color
code.
DE8URRING
<
>
MAKE
SURE
that
before
attempting
to
sleeve
ANY
of
the
pieces
of
tubing
together
you
check
to see
that
all
tubing
pieces
are
DE8URRED!
In building
the
antenna
we
have
removed
the
majority
of
the
burrs,
however,
due
to the
number
of pieces
of
tubing.
the
cost
of
labor
and
the
time
consumption
some
pieces
will
have
burrs.
The
tubing
Mosley
uses
is made
for us
and
the
sleeving
tolerances
are
very
close.
If you
would
try
and
force
a piece
of
tubing
to sleeve.
which
is not
deburred.
it will
SEIZE.
If this
would
happen
you
aren't
going
to get
them
aparto
This
is a beautiful
beam.
we have
put
a
lot of
time
and
pride
into
it,
take
a few minutes
and
check
the pieces.
NDTE:
Penetrc~,
an
anti-corrosion
compound
should
be
applied
between
coupled
sections
of
tubing
to prevent
formation
of high
resistance
and
seizing
of
aluminum.
CAUTIDNS
<
>
Deburr
tubing
and
use
the enclosed
PENETROX.
<
>
Review
the drawings
and
READ
the
instructions.
<
>
Follow
all
safety
procedures
in assembly
and
raising
of
this
beam.
When
installing
the
antenna.
make
sure
the
tower
and
all
other
associated
hardware,
assembly
personnel
and
components
are
rated
correctly
for
this
antenna!